Clients

This is the list of our main customers. Many thanks for your trust!

Project References

Projects in which ARDEO SOLUTIONS supplied equipment, material or services.

Pasig North Jacking, Sewerage

Pasig South Jacking, Microtunneling, Sewerage

Blog

Latest news about ARDEO SOLUTIONS

FIRE PROOF COUPLING!

The latest innovation from Teekay Couplings is a new patented AXILOCK fire proof sleeve.

COSMOKOKI Tech Center

At around 70km of Tokyo in Saitama prefecture near Hanno city, the Technical Center of COSMOKOKI is concentrating all range of equipment. During the visit, a demonstration of inserting plug installation was ongoing on a DN1650mm diameter ductile iron pipe pressurized at 5 bars for a customer from abroad.

ANNACIS Island WWTP

Metro Vancouver The new outfall will be excavated using a tunnel-boring machine. This machine will be launched from the entry shaft near the Annacis Island wastewater treatment plant and progress south to the river riser in the Fraser River. The project is expected to be completed in 2022. To ensure greater seismic resilience, JFE Engineering […]

500mm P3 VALVE

For the first time in Europe, a 500mm P3 valve from COSMOKOKI was installed under 4 bars pressure on a ductile iron sewerage pumping main without interruption of operation in France. Equipment was designed, developed and supplied by EIE (Equipement Industriel Européen) and installation was successfully carried out under the supervision of COSMOKOKI.

%d bloggers like this: